Week of October 7, 2018
Upcoming Lane Closures and Traffic Changes
The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.
ROUTE 29 / GAINESVILLE
No significant traffic impacts scheduled.
ROUTE 234 (SUDLEY ROAD) / MANASSAS
I-66 West from Compton Road to Sudley Road
Thursday, October 11: 8 p.m. to 5 a.m.
Three left lanes closed to implement long-term lane shifts for construction. Drivers should expect occasional 15-minute stoppages and slowdowns along eastbound I-66.
ROUTE 28 (SULLY ROAD) / CENTREVILLE
I-66 West from Stringfellow Road to west of Route 29 Centreville
Saturday, October 6: 9 p.m to 9 a.m.
Sunday, October 7: 8 p.m. to 5 a.m.
Monday, October 8: 9 p.m. to 6 a.m.
Three left lanes closed to implement long-term lane shifts for construction. Drivers should expect occasional 15-minute stoppages and slowdowns along westbound I-66.
Ramp from I-66 West to Route 29 Centreville
Saturday, October 6: 12 midnight to 4 a.m.
Temporary overnight closure of the ramp from I-66 West to Route 29 Centreville. Traffic will be detoured to the Route 28 South exit from I-66 West, then take the Route 29 South exit from Route 28 South.
Ramp from Route 29 Centreville Couth to I-66 West
Sunday, October 7: 12 midnight to 4 a.m.
Temporary overnight closure of the ramp from Route 29 Centreville South to I-66 West. Traffic will be detoured to make a U-turn at the median break at O’Day Drive to Route 29 North to exit to I-66 West.
ROUTE 286 (FAIRFAX COUNTY PARKWAY)
No significant traffic impacts scheduled.
ROUTE 50 / FAIRFAX
No significant traffic impacts scheduled.
ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX
No significant traffic impacts scheduled.
ROUTE 243 (NUTLEY STREET) / VIENNA
I-66 West from Virginia Lane to Nutley Street
Friday, October 12 – Saturday, October 13: 9 p.m. to 9 p.m.
At the I-495 interchange, a single left lane will be closed on westbound I-66 and on the ramps from northbound and southbound I-495 to westbound I-66, leading to three left lanes closed on westbound I-66 west of the I-495 interchange to implement long-term lane shifts for construction. Drivers should expect occasional 15-minute stoppages and slowdowns along westbound I-66.
I-495
I-66 West from Virginia Lane to Cedar Lane
Tuesday, October 9 – Wednesday, October 10: 9:30 p.m. to 5 a.m.
At the I-495 interchange, a single left lane will be closed on westbound I-66 and on the ramps from northbound and southbound I-495 to westbound I-66, leading to three left lanes closed on westbound I-66 west of the I-495 interchange to implement long-term lane shifts for construction. Drivers should expect occasional 15-minute stoppages and slowdowns along westbound I-66.
I-66 West from Virginia Lane to Nutley Street
Friday, October 12 – Saturday, October 13: 9 p.m. to 9 p.m.
At the I-495 interchange, a single left lane will be closed on westbound I-66 and on the ramps from northbound and southbound I-495 to westbound I-66, leading to three left lanes closed on westbound I-66 west of the I-495 interchange to implement long-term lane shifts for construction. Drivers should expect occasional 15-minute stoppages and slowdowns along westbound I-66.