The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 / GAINESVILLE

Route 29 North and South from Heathcote Boulevard to University Boulevard

Monday, Apr. 20, through Friday, May 15: 8 p.m. to 6 a.m.

Two lanes on northbound Route 29 and one lane on southbound Route 29 closed for drainage installation.

 

I-66 West from Route 234 Business to Route 29 Gainesville

Starts Monday, April 20

Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to all traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West from Route 234 Business to Route 29 Gainesville

Starts Monday, April 20

Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to all traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.

 

I-66 West near Bull Run

Monday, May 4, through Friday, May 8: 11 a.m. to 12 p.m.

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West from Cub Run to Bull Run

Monday, May 4, and Tuesday, May 5: 9 p.m. to 5 a.m.

Two left lanes closed for bridge work.

 

I-66 East from Route 234 Business to Bull Run

Wednesday, May 6, and Thursday, May 7: 9 p.m. to 5 a.m.

Two left lanes closed for bridge work.

 

Vandor Lane from Route 234 Business to Rest Area

Monday, Apr. 27, through Friday, May 29: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for utility work.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

Route 29 Centreville North and South at I-66

Turn lanes from Route 29 Centreville South to I-66 West

Monday, May 4, through Friday, May 8: 7 a.m. to 4 p.m.

Saturday, May 9: 7 a.m. to 3 p.m.

A single lane will be closed on Route 29 North and South at I-66 for bridge pier construction. The turn lanes from Route 29 South to I-66 West will also be narrowed to a single lane.

 

Ramp from Route 29 to I-66 East

Monday, May 4, throught Friday, May 8: midnight to 4 a.m.

Temporary overnight ramp closure for drainage construction.  Traffic will be directed to Route 28 to access I-66 East.

 

Compton Road at I-66

Monday, May 4, through Friday, May 22: 7 a.m. to 7 p.m.

Single lane, two-way traffic with flagging operation for bridge construction.

 

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Monday, May 4, through Friday, May 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on I-66 East and West, Route 28 North and South for blasting operations.

 

I-66 West from Cub Run to Bull Run

Monday, May 4, and Tuesday, May 5: 9 p.m. to 5 a.m.

Two left lanes closed for bridge work.

 

I-66 East from Compton Road to Route 29

Monday, May 4, through Friday, May 8: 9 p.m. to 5 a.m.

Two right lanes closed for barrier demolition.

 

I-66 West from Route 28 to Route 29

Monday, May 4, through Friday, May 8: 9 p.m. to 5 a.m.

Two right lanes closed for retaing wall construction.

 

Route 28 North from Braddock Road to Westfields Boulevard

Sunday, May 3, through Friday, May 8: 8 p.m. to 4:30 a.m.

Two lanes will be closed for paving.

 

Route 28 South from Westfields Boulevard to Braddock Road

Sunday, May 3, through Friday, May 8: 8 p.m. to 6 a.m.

Two lanes will be closed for paving.

 

Stringfellow Road South from Fair Lake Boulevard to Westbrook Drive

HOV Ramp from I-66 West to Stringfellow Road

Monday, May 4, through Friday, May 8: 8 p.m. to 5 a.m.

Strinfellow Road will be reduced to two lanes, one in each direction.  The two open travel lanes will use the northbound lanes of Stringfellow Road under I-66.   The HOV ramp from I-66 West to Stringfellow Road will be right turn only from 8 p.m. to 4:30 a.m. Drivers will be directed to turn right onto northbound Stringfellow Road, stay to the left, and make a U-turn at Fair Lakes Boulevard onto southbound Stringfellow Road.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road South from Fair Lake Boulevard to Westbrook Drive

HOV Ramp from I-66 West to Stringfellow Road

Monday, May 4, through Friday, May 8: 8 p.m. to 5 a.m.

Strinfellow Road will be reduced to two lanes, one in each direction.  The two open travel lanes will use the northbound lanes of Stringfellow Road under I-66.   The HOV ramp from I-66 West to Stringfellow Road will be right turn only from 8 p.m. to 4:30 a.m. Drivers will be directed to turn right onto northbound Stringfellow Road, stay to the left, and make a U-turn at Fair Lakes Boulevard onto southbound Stringfellow Road.

 

ROUTE 50 / FAIRFAX

Route 50 East at I-66

Ramp from Route 50 East to I-66 East

Monday, Apr. 20, through Saturday, August 1

Single left lane closed for bridge abutment construction and utility work.

 

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Saturday, May 11

Single left HOV lane closed for bridge pier construction.

 

I-66 East from Monument Drive to Waples Mill Road

Thursday, May 7: 9 p.m. to 5 a.m.

Three lanes closed for overhead gantry removal.  Drivers should expect slowdowns and periodic 20-minute stoppages between midnight and 4 a.m.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Saturday, May 11

Single left HOV lane closed for bridge pier construction.

 

I-66 East from Waples Mill Road to Jermantown Road

Monday, May 4, through Friday, May 15: 8 p.m. to 6 a.m.

Two right lanes closed for crews to adjust barrier.   

 

ROUTE 243 (NUTLEY STREET) / VIENNA

Cedar Lane from Hilltop Drive to Cottage Street

Monday, Apr. 27, through Friday, May 15: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for underground waterline relocation.

 

I-66 West from Cedar Lane to Route 243 (Nutley Street)

Sunday, May 3, and Monday, May 4: 9 p.m. to 5 a.m.

Two left lanes closed for crews to set barrier.

 

Saintsbury Drive from Vaden Drive to Blake Lane

Monday, Apr. 27, through Friday, May 15: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for utility work.

 

Sutton Road from Blake Lane to Sutton Green Court

Monday, May 4, through Monday, May 25: 8 a.m. to 6 p.m.

Single lane, two-way traffic with flagging operation for utility work.

 

I-495 (CAPITAL BELTWAY)

Ramp from I-66 East to I-495 North

Beginning Monday, April 20 at 8 p.m. 

The left lane of two will be closed for bridge pier construction.

 

Ramp from I-495 North to I-66 West

Beginning Monday, April 20 at 8 p.m. 

The left lane of two will be closed for bridge pier construction.

 

I-495 North from Route 29 to I-66

Monday, Apr. 27, through Friday, May 22: 9 p.m. to 5 a.m.

Two lanes will be closed for bridge construction.