Week of May 17, 2020
The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.
ROUTE 29 / GAINESVILLE
I-66 West from Groveton Road to University Boulevard
Ramp from Route 234 Bypass (Prince William Parkway) to I-66 West
From 9 p.m. Friday, May 15, through noon on Monday, May 18
I-66 West will be reduced to two travel lanes for paving operations. The ramp from Route 234 Bypass North to I-66 West will also be closed. Traffic will be directed to I-66 East, take the exit for northbound Route 234 Business, then follow signs to I-66 West.
I-66 West from Route 234 Business to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to all traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.
ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS
I-66 West from Groveton Road to University Boulevard
Ramp from Route 234 Bypass to I-66 West
From 9 p.m. Friday, May 15, through noon on Monday, May 18
I-66 West will be reduced to two travel lanes for paving operations. The ramp from Route 234 Bypass North to I-66 West will also be closed. Traffic will be directed to I-66 East, take the exit for northbound Route 234 Business, then follow signs to I-66 West.
I-66 West from Route 234 Business to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.
Ramp from I-66 East to Route 234 Business North and South
Monday, May 18: 10 p.m. to 5 a.m.
The ramp will be closed for drainage installation. Traffic will directed to exit prior to the closure at Exit 44 (Route 234 Bypass) South, turn left on to Balls Ford Road to Route 234 Business.
I-66 West near Bull Run
Monday, May 18, through Friday, May 22: 11 a.m. to 12 p.m.
Temporary 15-minute stoppages of traffic for blasting operations.
Vandor Lane from Route 234 Business to Rest Area
Ongoing, between 7 a.m. to 5 p.m.
Flagging operation for utility work.
ROUTE 28 (SULLY ROAD) / CENTREVILLE
Compton Road at I-66
Monday, May 18, through Thursday, May 21:
Friday, May 22: 7 a.m. to 3 p.m.
Flagging operation for bridge construction.
Ramp from Route 29 North and South to I-66 East
Tuesday, May 19, through Thursday, May 21: 9 p.m. to 4 a.m.
The ramp will be closed for storm sewer installation. Traffic will be directed to Route 28 to access I-66 East.
I-66 East and West between Route 29 Centreville and Stringfellow Road
Route 28 North and South between Route 29 and Braddock Road
Monday, May 18, through Friday, May 22: 11 a.m. to noon, and 2 p.m. to 3 p.m.
Temporary 15-minute stoppages of traffic on I-66 East and West, and Route 28 North and South for blasting operations.
Ramp from I-66 East to Route 28 North
Sunday, May 17, through Thursday, May 21: 9 p.m. to 4 a.m.
The ramp will be closed nightly. Traffic will be detoured farther east to Route 286 (Fairfax County Parkway) North, stay to the right for I-66 West, then follow signs to Route 28 North.
Route 28 North from Braddock Road to Westfields Boulevard
Sunday, May 17, through Thursday, May 21: 8 p.m. to 4:30 a.m.
Two lanes will be closed for paving.
Route 28 South from Westfields Boulevard to Braddock Road
Sunday, May 17, through Thursday, May 21: 8 p.m. to 6 a.m.
Friday, May 22: 9:30 p.m. to 6 a.m.
Two lanes will be closed for paving.
Ramp from I-66 West to Route 28 North
Thursday night, May 21: Midnight to 4 a.m.
The ramp will be closed for sign removal. Traffic will be detoured to Route 28 South, stay to the right for Route 29 North, continue to stay to the right and follow signs to Route 28 North.
ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES
No significant impacts scheduled.
ROUTE 50 / FAIRFAX
Route 50 East at I-66
Ramp from Route 50 East to I-66 East
Ongoing
The left lane will be closed for bridge abutment construction and utility work.
I-66 West from Jermantown Road to Route 50
Ongoing
The HOV lane will be closed for bridge pier construction.
I-66 East at Route 50
Saturday, May 16: 7 a.m. to 2 p.m.
One lane closed for bridge work.
I-66 East from Monument Drive to Waples Mill Road
Sunday, May 17, through Saturday, May 23: 9 p.m. to 5 a.m.
Three lanes will be closed for bridge construction at Waples Mill Road.
I-66 East from Route 50 to Jermantown Road
Sunday, May 17, through Friday, May 22: 8 a.m. to 6 p.m.
The left lane will be closed for bridge pier construction.
ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX
I-66 West from Jermantown Road to Route 50
Ongoing
The HOV lane will be closed for bridge pier construction.
I-66 East from Jermantown Road to Route 123
Wednesday, May 20, through Thursday, May 21: 9 p.m. to 5 a.m.
Friday, May 22: 10 p.m. to 5 a.m.
Two lanes will be closed for geotechnical work and sign removal.
ROUTE 243 (NUTLEY STREET) / VIENNA
Cedar Lane between Hilltop Drive and Cottage Street
Ongoing, through November
Cedar Lane over I-66 will be closed for demolition and reconstruction of the bridge.
I-66 West from Gallows Road to Cedar Lane
Monday, May 18, through Thursday, May 22: 9 p.m. to 5 a.m.
Two lanes will be closed for bridge demolition.
Ramp from Route 243 (Nutley Street) South to I-66 West
Thursday night, May 21: Midnight to 4 a.m.
The ramp will be closed to implement a lane shift on Nutley Street. Traffic will be directed to I-66 East, stay to the right for Nutley Street North, then continue to stay to the right and follow signs to I-66 West.
Saintsbury Drive from Vaden Drive to Blake Lane
Continuing through Tuesday, May 26: 7 a.m. to 5 p.m.
Flagging operation for utility work.
Sutton Road from Blake Lane to Sutton Green Court
Continuing through Friday, May 22: 8 a.m. to 6 p.m.
Flagging operation for utility work.
I-495 (CAPITAL BELTWAY) / DUNN LORING
Ramp from I-66 East to I-495 North
Ongoing
The right lane of two will be closed for bridge pier construction.
I-495 North from Route 29 to I-66
Continuing through Thursday, May 21: 7 p.m. to 5 a.m.
Two lanes will be closed for bridge construction.
I-495 South from Route 7 (Leesburg Pike) to I-66
Tuesday, May 19, and Wednesday, May 20: 9 p.m. to 5 a.m.
Two lanes will be closed for bridge construction.