The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 (LEE HIGHWAY) / GAINESVILLE

No impactful work currently scheduled.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West from Route 234 Business (Sudley Road) to Groveton Road

Tuesday, March 30, through Thursday, April 1: 8 p.m. to 5 a.m.

Two lanes will be closed for crews to implement lane shifts

 

Ramp from I-66 West to Route 234 Business North and South

Monday, March 29, and Tuesday, March 30: 11 p.m. to 5 a.m.

The ramp will be closed. Traffic will be directed to continue farther west to Route 29 (Lee Highway) North Gainesville, stay to the left on the ramp and turn left at the traffic signal on to Route 29 South, stay to the right to reach I-66 East, then follow signs to Route 234 Business North or South.

 

I-66 West from west of Route 234 Business to Groveton Road

Ongoing, through April 1

The HOV lane will be closed for bridge pier construction.

 

ROUTE 29 (LEE HIGHWAY) / CENTREVILLE

Route 29 (Lee Highway) Centreville North at I-66

Monday, March 29, through Saturday, April 3: 9 a.m. to 3 p.m.

One lane will be closed for bridge pier construction.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

Route 28 North at I-66

Ongoing

The right lane of Route 28 North at I-66 will remain closed to provide an extended merge lane for the ramp from I-66 East to Route 28 North.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES

Stringfellow Road North and South at I-66

Monday, March 29, through Thursday, April 1: 9 a.m. to 5 p.m. and 9 p.m. to 5 a.m.

Friday, April 2: 9 a.m. to 5 p.m.

The right lane will be closed for bridge work.

 

Route 286 (Fairfax County Parkway) South at I-66

Tuesday, March 30: 9 p.m. to 5 a.m.

Starting around 9 a.m., two lanes will be closed.  Between midnight and 4 a.m., southbound Route 286 (Fairfax County Parkway) will be closed. All southbound Route 286 traffic will be directed to exit the parkway to I-66 West, continue to Route 28 South, stay to the right for I-66 East, then follow signs to Route 286 South.

 

Route 286 (Fairfax County Parkway) North at I-66

Tuesday, March 30: 9 p.m. to 5 a.m.

Two lanes will be closed.

 

Route 286 (Fairfax County Parkway) North and South at I-66

Wednesday, March 31: 5 a.m. to 3 p.m.

The left lane will be closed for pile driving in the median.

 

Ramp from Route 286 (Fairfax County Parkway) South to I-66 East

Tuesday night, March 30: midnight to 4 a.m.

The ramp will be closed.  Traffic will be directed to exit the parkway to I-66 West, continue to Route 28 South, and stay to the right for I-66 East.

 

Ramp from I-66 West to Route 286 (Fairfax County Parkway South)

Tuesday night, March 30: midnight to 4 a.m.

The ramp will be closed.  Traffic will be directed to continue on I-66 West to Route 28 South, stay to the right for I-66 East, then follow signs to Route 286 South.

 

I-66 East and West between Monument Drive and Waples Mill Road

Monday, March 29, through Friday, April 2: 9 p.m. to 5 a.m.

I-66 East and West will be reduced to a single travel lane approaching Route 50 for overhead bridge work. Drivers should expect periodic stoppages of up to 20 minutes between midnight and 4 a.m.

 

I-66 West from Route 50 to Route 286 (Fairfax County Parkway)

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

ROUTE 50 / FAIRFAX

I-66 East and West between Monument Drive and Waples Mill Road

Monday, March 29, through Friday, April 2: 9 p.m. to 5 a.m.

I-66 East and West will be reduced to a single travel lane approaching Route 50 for overhead bridge work. Drivers should expect periodic stoppages of up to 20 minutes between midnight and 4 a.m.

 

I-66 West from Route 50 to Route 286 (Fairfax County Parkway)

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

Route 50 East at I-66

Ramp from Route 50 East to I-66 East

Ongoing

The left lane will be closed for bridge construction.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

Ramp from I-66 West to Route 123 (Chain Bridge Road) North and South

Tuesday night, March 30, and Wednesday night, March 31: Midnight to 4 a.m.

The ramp will be closed. Traffic will be directed to continue farther west to Route 50 East, stay left to reach I-66 East, then follow signs to Route 123 North or South.

 

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 West from Cedar Lane to Nutley Street

Monday, March 29, through Thursday, April 1: 10 p.m. to 5 a.m.

Two lanes will be closed.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-495 (CAPITAL BELTWAY) / DUNN LORING

Gallows Road over I-66

Thursday, April 1: 9 p.m. to 5 a.m.

Gallows Road over I-66 will be reduced to a single travel lane in each direction. Northbound Gallows Road will be closed with two-way traffic running in the southbound lanes.