Week of March 22, 2020

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

ROUTE 29 / GAINESVILLE

No significant traffic impacts scheduled.

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West near Bull Run

Monday, Mar. 23, through Thursday, Mar. 26: 11 a.m. to 12 p.m.

Temporary 15-minute stoppages of traffic on I-66 West for blasting operations.

I-66 East between Bull Run Rest Stop and Cub Run

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27: 9 p.m.to 9 a.m.

Three right lanes closed for crews to install bridge beams over Cub Run.

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Monday, Mar. 23, through Friday, Mar. 27: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on I-66 East and West, Route 28 North and South and on Braddock Road near Route 28 for blasting operations.

I-66 East from Compton Road to Route 28

Ramp from I-66 East to Route 28 North

Sunday, Mar. 22, and Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27: 9 p.m. to 9 a.m.

Three lanes of eastbound I-66 lanes will be closed for overhead bridge work.  The ramp from I-66 East to Route 28 North will also be closed between midnight and 4 a.m. (5 a.m. Friday night/Saturday morning). Traffic will be detoured farther east to Route 286 (Fairfax County Parkway) North, stay to the right for I-66 West, then follow signs to Route 28 North.

I-66 East between Bull Run Rest Stop and Cub Run

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27: 9 p.m.to 9 a.m.

Three right lanes closed for crews to install bridge beams over Cub Run.

I-66 East at Route 29 Centreville

Monday, Mar. 23, through Friday, Mar. 27: 9 a.m. to 6:30 p.m.

Single right lane closure for bridge work.

Route 28 South between Westfields Boulevard and E.C. Lawrence Park athletic fields

Tuesday, Mar. 24: 9 p.m. to 5 a.m.

Two left lanes closed for overhead bridge work.

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road between Fair Lakes Boulevard and Village Square Drive

Monday, Mar. 23, through Friday, Mar. 27: 9 p.m. to 3 p.m.

Friday, Mar. 27, from 9 p.m. until 3 p.m. Monday, Mar. 30

The right lane of southbound Stringfellow Road will be closed for underground utility relocation. The lane will be reopened weekdays between 3 p.m. and 9 p.m. to accommodate the evening rush.

Route 286 North and South from Lee Highway (Route 29) to Fair Lakes Parkway

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27: 10 p.m. to 8 a.m.

Two lanes closed for over head bridge demoltion of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

ROUTE 50 / FAIRFAX

I-66 West from Blake Lane to Jermantown Road

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27, and Saturday, Mar. 28: 9 p.m. to 9 a.m.

Three left lanes closed for center bridge pier work at Jermantown Road. Drivers should expect slowdowns and periodic 20-minute stoppages between midnight and 4 a.m.

I-66 East from Route 50 to Jermantown Road

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27, and Saturday, Mar. 28: 9 p.m. to 9 a.m.

Two left lanes closed for center bridge pier work at Jermantown Road.

I-66 East from West Ox Road to Route 50

Monday, Mar. 23: 9 p.m. to 5 a.m.

Two left lanes closed for crane mobilization.

I-66 West from Route 50 to Monument Drive

Wednesday, Mar. 25, and Thursday, Mar. 26: 9 p.m. to 5 a.m.

Single right lane closed for barrier wall demolition.

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 West from Blake Lane to Jermantown Road

Monday, Mar. 23, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Friday, Mar. 27, and Saturday, Mar. 28: 9 p.m. to 9 a.m.

Three left lanes closed for center bridge pier work at Jermantown Road. Drivers should expect slowdowns and periodic 20-minute stoppages between midnight and 4 a.m.

I-66 East and West at Jermanton Road

Monday, Mar. 23, through Sunday, Mar. 29: 8 a.m. to 6:30 p.m.

Single left HOV lane on eastbound and westbound I-66 closed for pile driving for new center bridge pier.  

ROUTE 243 (NUTLEY STREET) / VIENNA

Ramp from Route 243 (Nutley Street) South to I-66 East

Sunday, Mar. 22, through Thursday, Mar. 26: 10 p.m. to 5:30 a.m.

The ramp from southbound Nutley Street to eastbound I-66 will be temporarily closed.   Traffic will be detoured farther south on Nutley Street, make a U-turn at Route 29 (Lee Highway), then stay to the right to exit to I-66 East.

Ramp from I-66 East to Route 243 (Nutley Street) North

Sunday, Mar. 22, through Thursday, Mar. 26: 10 p.m. to 5:30 a.m.

The ramp from eastbound I-66 to northbound Nutley Street will be temporarily closed.  Traffic will be detoured to the exit for southbound Nutley Street, make a U-turn at Route 29 (Lee Highway), back to northbound Nutley Street.

I-66 East from Blake Lane to Nutley Street

Sunday, Mar. 22, through Thursday, Mar. 26: 9 p.m. to 5 a.m.

Two right lanes closed for barrier wall demolition. The eastbound collector-distributor lane will also be narrowed.

Cedar Lane from Hilltop Drive to Cottage Street

Monday, Mar. 23, through Friday, Mar. 27: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for underground waterline relocation.

I-66 East and West at Nutley Street

Monday, Mar. 23, through Friday, Mar. 27: 9 a.m. to 6:30 p.m.

Single right lane closure on eastbound and westbound I-66 nearly Nutley Street for barrier wall demolition and paving.   The eastound and westbound collector-distributor lanes will also be narrowed.   

I-495 (CAPITAL BELTWAY)

Ramp from I-66 East to I-495 South Express Lanes

Wednesday, Mar. 25, and Thursday, Mar. 26: 8 p.m. to 5 a.m.

The ramp from eastbound I-66 to the southbound I-495 Express Lanes will be temporarily closed.  Traffic will be directed to take the exit for the I-495 South general-purpose lanes.

I-495 South from Route 7 to I-66

Monday, Mar. 23, and Tuesday, Mar. 26: 10 p.m. – 5 a.m.

Two left lanes closed for bridge work.