Week of March 15, 2020

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

ROUTE 29 / GAINESVILLE

No significant traffic impacts scheduled.

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West near Bull Run

Monday, Mar. 16, through Thursday, Mar. 19: 11 a.m. to 12 p.m.

Temporary 15-minute stoppages of traffic on I-66 West for blasting operations.

I-66 East between Compton Road and Route 29 Centreville

Monday, Mar. 16, through Thursday, Mar. 19: 9 p.m. to 5 a.m.

Three lanes closed for crews to implement lane shifts.

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road at Route 28

Monday, Mar. 16, through Friday, Mar. 20: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on I-66 East and West, Route 28 North and South and on Braddock Road near Route 28 for blasting operations.

Route 28 North between Route 29 and I-66

Ramp from I-66 East to Route 28 North

Sunday, Mar. 15, and Monday, Mar. 16: 9 p.m. to 5 a.m.

Two right lanes of northbound Route 28 lanes will be closed for overhead bridge work.  The ramp from I-66 East to Route 28 North will also be closed between midnight and 4 a.m. Drivers will be detoured farther east to Route 286 (Fairfax County Parkway) North, stay to the right for I-66 West, then follow signs to Route 28 North.

I-66 East between Compton Road and Route 29 Centreville

Monday, Mar. 16, through Thursday, Mar. 19: 9 p.m. to 5 a.m.

Three lanes closed for crews to implement lane shifts.

Route 28 North and South between Route 29 and Braddock Road

Left-turn lanes from Route 28 South to I-66 East

Tuesday, Mar. 17 and Wednesday, Mar. 18: 9 p.m. to 5 a.m.

Two left lanes of northbound and southbound Route 28 will be closed for overhead bridge work.  The left-turn lanes from Route 28 South to I-66 East will also be closed between midnight and 4 a.m.  Drivers will be detoured farther south to Route 29 (Lee Highway) North, stay to the right for Route 28 North, then follow signs to I-66 East.

Route 28 South between Westfields Boulevard and E.C. Lawrence Park athletic fields

Tuesday, Mar. 17, and Wednesday, Mar. 18: 9 p.m. to 5 a.m.

Two left lanes closed for overhead bridge work.

Route 28 South between Route 29 and Braddock Road

Thursday, Mar. 19: 9 p.m. to 5 a.m.

Friday, Mar. 20: 10 p.m. to 8 a.m.

Two right lanes closed for overhead bridge work.

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road between Fair Lakes Boulevard and Village Square Drive

Monday, Mar. 16, through Friday, Mar. 20: 9 p.m. to 3 p.m.

Friday, Mar. 20, from 9 p.m. until 3 p.m. Monday, Mar. 23

The right lane of southbound Stringfellow Road will be closed for underground utility relocation. The lane will be reopened weekdays between 3 p.m. and 9 p.m. to accommodate the evening rush.

Route 286 North and South from Lee Highway (Route 29) to Fair Lakes Parkway

Monday, Mar. 16, through Thursday, Mar. 19: 9 p.m. to 5 a.m.

Friday, Mar. 20: 10 p.m. to 8 a.m.

Two lanes closed for over head bridge demoltion of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

ROUTE 50 / FAIRFAX

No significant traffic impacts scheduled.

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

Ramp from Route 123 North to I-66 East

Monday, Mar. 16, and Saturday, Mar. 21: midnight to 4 a.m.

The ramp from northbound Route 123 to eastbound I-66 will be temporarily closed.  Drivers will be detoured farther north on Route 123, stay to the left and turn left at the traffic signal on to I-66 West to the Route 50 interchange, take the exit for Route 50 East, then stay to the left to exit to I-66 East.

I-66 West from Blake Lane to Jermantown Road

Sunday, Mar. 15: 9 p.m. to 5 a.m.

Three left lanes closed on westbound I-66.                                                                                              

ROUTE 243 (NUTLEY STREET) / VIENNA

Ramp from Ropute 243 (Nutley Street) South to I-66 East

Sunday, Mar. 15, through Thursday, Mar. 19: midnight to 4 a.m.

The ramp from southbound Nutley Street to eastbound I-66 will be temporarily closed.   Drivers will be detoured farther south on Nutley Street, make a U-turn at Route 29 (Lee Highway), then stay to the right to exit to I-66 East.

 I-495 (CAPITAL BELTWAY)

Ramp from I-66 East to I-495 South Express Lanes

Monday, Mar. 16, through Thursday, Mar. 19: 8 p.m. to 5 a.m.

The ramp from eastbound I-66 to the southbound I-495 Express Lanes will be temporarily closed.  Drivers will be directed to take the exit for the I-495 South general-purpose lanes.

I-495 South from Route 7 to Route 29

Monday, Mar. 16, and Tuesday, Mar. 17: 10 p.m. – 5 a.m.

Three left lanes closed for bridge work. Drivers should expect occasional 20-minute stoppages and slowdowns.