Week of June 7, 2020
The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.
ROUTE 29 / GAINESVILLE
I-66 West from Route 234 Business to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to all traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.
Ramp from I-66 East to Prince William Parkway
Friday, June 12: 10 p.m. to 8 a.m.
The ramp will be closed for paving and implementing traffic shift. Traffic will be detoured to continue on eastbound I-66 to the Sudley Road (Route 234 Business) interchange, turn left onto northbound Sudley Road, and then turn left at the light onto westbound I-66 back to Prince William Parkway.
ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS
I-66 West from Route 234 Business to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between noon and 8 p.m. daily, three travel lanes will be open to traffic. Between 8 p.m. and 6 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6 a.m. and noon daily, two lanes will be closed, leaving two travel lanes open.
I-66 West near Bull Run
Monday, June 8, through Friday, June 12: 11 a.m. to 12 p.m.
Temporary 15-minute stoppages of traffic for blasting operations.
I-66 East from Groveton Road to Route 234 Business
Thursday, June 11: 9 p.m. to 5 a.m.
Three lanes closed for overhead gantry removal. Drivers should expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.
Vandor Lane from Route 234 Business to Rest Area
Ongoing, between 7 a.m. to 5 p.m.
Flagging operation for utility work.
ROUTE 28 (SULLY ROAD) / CENTREVILLE
I-66 East and West between Route 29 Centreville and Stringfellow Road
Route 28 North and South between Route 29 and Braddock Road
Monday, June 8, through Friday, June 12: 11 a.m. to noon
Temporary 15-minute stoppages of traffic on I-66 East and West, and Route 28 North and South for blasting operations.
Ramp from I-66 East to Route 28 North
Nightly, through June 14
Monday through Friday: 9 p.m. to 4 a.m.
Saturday and Sunday: 9 p.m. to 6 a.m.
The ramp will be closed nightly. Traffic will be detoured farther east to Route 286 (Fairfax County Parkway) North, stay to the right for I-66 West, then follow signs to Route 28 North.
Route 28 North from Braddock Road to Westfields Boulevard
Sunday, June 7, through Thursday, June 11: 8 p.m. to 4:30 a.m.
Two lanes will be closed for crews to implement a traffic shift (June 7) and paving.
Route 28 South from Westfields Boulevard to Braddock Road
Sunday, June 7, through Thursday, June 11: 8 p.m. to 6 a.m.
Two lanes will be closed for crews to implement a traffic shift (June 7) and paving.
ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES
No significant impacts scheduled.
ROUTE 50 / FAIRFAX
Route 50 East at I-66
Ramp from Route 50 East to I-66 East
Ongoing
The left lane will be closed for bridge abutment construction and utility work.
I-66 West from Jermantown Road to Route 50
Continuing through Friday, June 12
The HOV lane will be closed for bridge pier construction.
I-66 West from Route 123 to Route 50
Monday, June 8, through Friday, June 12
Three lanes closed for bridge work.
I-66 East from Route 50 to Jermantown Road
Monday, June 8, through Friday, June 12: 8 a.m. to 6 p.m.
The HOV lane will be closed for bridge pier construction.
I-66 East from West Ox Road to Route 50
Monday, June 8, through Friday, June 12: 9 p.m. to 5 a.m.
Three lanes closed for bridge construction.
ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX
I-66 West from Jermantown Road to Route 50
Continuing through Friday, June 12
The HOV lane will be closed for bridge pier construction.
I-66 East from Waples Mill Road to Jermantown Road
Sunday, June 7, through Thursday, June 11: 9 p.m. to 5 a.m.
Two lanes closed for bridge construction.
I-66 West from Route 123 to Route 50
Monday, June 8, through Friday, June 12
Three lanes closed for bridge construction.
I-66 East from Route 50 to Jermantown Road
Monday, June 8, through Friday, June 12: 8 a.m. to 6 p.m.
The HOV lane will be closed for bridge pier construction.
ROUTE 243 (NUTLEY STREET) / VIENNA
Cedar Lane between Hilltop Drive and Cottage Street
Ongoing, through November
Cedar Lane over I-66 will be closed for demolition and reconstruction of the bridge.
I-66 East from Route 123 to Nutley Street
Monday, June 8, through Thursday, June 11: 9 p.m. to 4:30 a.m.
Friday, June 12: 9 p.m. to 6 a.m.
Saturday, June 13: 9 p.m. to 9 a.m.
I-66 East will be reduced to on travel lane for bridge beam installation at Vaden Drive near the Vienna Metrorail Station and overhead gantry removal near Nutley Street.
On Tuesday night, June 9, Thursday night, June 11 and Saturday night, June 13, drivers should expected periodic 30-minute stoppages at Vaden Drive for crews to lift bridge beams into place. Additionally, on Monday night, June 8, and Tuesday night, June 9, drivers should expect periodic 20-minute stoppages and slowdowns east of Nutley Street, between midnight and 4 a.m.
I-66 East from Blake Lane to east of Nutley Street
Monday, June 8, and Tuesday, June 9: 9 p.m. to 5 a.m.
Two lanes closed for overhead gantry removal. Drivers should expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.
Saintsbury Drive from Vaden Drive to Blake Lane
Continuing through Friday, June 12: 7 a.m. to 5 p.m.
Flagging operation for utility work.
I-66 East from Nutley Street to Cedar Lane
Monday, June 8, through Wednesday, June 10: 9 p.m. to 5 a.m.
Two lanes will be closed for bridge beam removal. Drivers should expect periodic 20-minute stoppages and slowdowns.
I-495 (CAPITAL BELTWAY) / DUNN LORING
Ramp from I-66 East to I-495 North
Continuing through Friday, June 12
The right lane of two will be closed for bridge pier construction.
I-66 West at I-495
Tuesday, June 9, through Thursday, June 11: 9 p.m. to 5 a.m.
Two lanes closed for crews to implement lane shift and set concrete barrier.
Ramp from I-66 East to I-495 South Express Lanes
Wednesday, June 10: 8 p.m. to 5 a.m.
The ramp will be closed for utility work. Traffic will be directed to take the exit for the southbound I-495 general purpose lanes
I-495 North from Route 29 to I-66
Monday, June 8, through Friday, June 12: 10 p.m. to 5 a.m.
Two lanes will be closed for bridge construction.
I-495 South from Route 7 (Leesburg Pike) to I-66
Monday, June 8: 10 p.m. to 5 a.m.
Thursday, June 11, and Friday, June 12: 10 p.m. to 5 a.m.
On Monday night, June 8, three lanes will be closed for bridge construction. On Thursday night, June 11 and Friday night, June 12 two lanes will be closed.