Week of January 3, 2021

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 (LEE HIGHWAY) / GAINESVILLE

I-66 East and West between University Boulevard and Route 234 (Prince William Parkway)

Tuesday, January 5, through Friday, January 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 East and West between University Boulevard and Route 234 (Prince William Parkway)

Tuesday, January 5, through Friday, January 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 East from Route 234 Business (Sudley Road) to Manassas Safety Rest Area

Tuesday, January 5, through Friday, January 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West from Compton Road to Route 234 Business (Sudley Road)

Monday, December 28, through Wednesday, December 30: 9 p.m. to 6 a.m.

Three lanes will be closed for crews to implement traffic shift.

 

ROUTE 29 (LEE HIGHWAY) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Tuesday, January 5, through Friday, January 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West from west of Route 29 Centreville and Cub Run

Ongoing

The HOV lane will be closed for retaining wall construction.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Tuesday, January 5, through Friday, January 8: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

Route 28 North at I-66

Ongoing

The right lane of Route 28 North at I-66 will remain closed to provide an extended merge lane for the ramp from I-66 East to Route 28 North.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES

Stringfellow Road North and South at I-66

Monday, January 4, through Friday, January 8: 9 a.m. to 5 p.m., and 9 p.m. to 5 a.m.

The right lane will be closed bridge work.

 

I-66 West from Route 50 to Route 286

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 (Fairfax County Parkway) to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

ROUTE 50 / FAIRFAX

I-66 West from Jermantown Road to Waples Mill Road

Tuesday, January 5, through Thursday, January 7: 9 p.m. to 5 a.m.

Friday, January 8: 9 p.m. to 9 a.m.

Three lanes closed for overhead bridge work.

 

I-66 West from Route 50 to Route 286 (Fairfax County Parkway) 

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

Route 50 East at I-66

Ramp from Route 50 East to I-66 East

Ongoing

The left lane will be closed for bridge construction.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 East and West between Jermantown Road and Blake Lane

Wednesday, January 6, and Thursday, January 7: 9 p.m. to 5 a.m.

Friday, January 8: 9 p.m. to 9 a.m.

Three lanes will be closed for overhead utility work on the new Route 123 Bridge over I-66 and for demolition of the old Route 123 Bridge over I-66.  Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m. nightly.

 

Right-turn lane from Route 123 South to Rose Forest Drive

Ongoing

The right-turn lane will be closed for Verizon utility line relocation.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 East and West from Cedar Lane to I-495
Sunday, January 3, through Thursday, January 7: 9:30 p.m. to 5 a.m.

Friday, January 8: 9 p.m. to 9 a.m.

I-66 East and West will be reduced to one travel lane for overhead bridge work at Gallows Road. Drivers should expect periodic stoppages of up to 20 minutes between 11 p.m. and 4 a.m. nightly.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

I-495 (CAPITAL BELTWAY) / DUNN LORING

I-66 East and West from Cedar Lane to I-495
Sunday, January 3, through Thursday, January 7: 9:30 p.m. to 5 a.m.

Friday, January 8: 9 p.m. to 9 a.m.

I-66 East and West will be reduced to one travel lane for overhead bridge work at Gallows Road. Drivers should expect periodic stoppages of up to 20 minutes between 11 p.m. and 4 a.m. nightly.

Ramp from the 495 Express Lanes North to I-66 West
Sunday, January 3, through Thursday, January 7:: 9 p.m. to 5 a.m.

Friday, January 8: 11 p.m. to 5 a.m.
The ramp will be closed. Traffic will be detoured to I-66 East, to Route 7, stay to the left and turn left at the traffic signal, stay to the right and follow signs to I-66 West.

Gallows Road between Bellforest Drive and Stenhouse Place
Sunday, January 3, through Thursday, January 7: 9 p.m. to 5 a.m.

Friday, January 8: 10 p.m. to 6 a.m.

Gallows Road over I-66 will be reduced to a single travel lane in each direction during the overnight hours for bridge beam installation for new Gallows Road Bridge. Two-way traffic will run in the southbound lanes of Gallows Road.

 

Gallows Road North and South between Bellforest Drive and Cottage Street

Monday, January 4, through Friday, January 8: 8:30 a.m. to 4 p.m.

One lane will be closed for utility work.

 

I-495 South from Route 7 to I-66

Monday, January 4, through Wednesday, January 6: 10 p.m. to 5 a.m.

Three lanes will be closed for overhead bridge work. Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m. nightly.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.