The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 (LEE HIGHWAY) / GAINESVILLE

I-66 East and West between University Boulevard and Route 234 (Prince William Parkway)

Monday, January 11, through Friday, January 15: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West between Route 234 (Prince William Parkway) and University Boulevard

Wednesday, January 13, and Thursday, January 14: 9 p.m. to 5 a.m.

Two lanes will be closed for crews to shift barrier.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 East and West between University Boulevard and Route 234 (Prince William Parkway)

Monday, January 11, through Friday, January 15: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 East from Route 234 Business (Sudley Road) to Manassas Safety Rest Area

Wednesday, January 13, through Friday, January 15: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

ROUTE 29 (LEE HIGHWAY) / CENTREVILLE

Route 29 (Lee Highway) North at I-66

Monday, January 11, through Friday, January 15: 9 p.m. to 5 a.m.

One lane will be closed for overhead bridge demolition.

 

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Monday, January 11, through Friday, January 15: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West from west of Route 29 Centreville and Cub Run

Ongoing

The HOV lane will be closed for retaining wall construction

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Monday, January 11, through Friday, January 15: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

Route 28 South from E.C. Lawrence Park to I-66

Thursday, January 14, and Friday, January 15: 9 p.m. to 5 a.m.

Two lanes will be closed for crews to implement traffic shift.

 

Ramp from I-66 West to Route 28 South

Thursday night, January 14, and Friday night, January 15: midnight to 4 a.m.

The ramp will be closed.  Traffic will be detoured to the exit for Route 29 Centreville, turn left at traffic signal at the bottom of the ramp on to Route 29 North, continue on Route 29 North and stay to the right to exit to Route 28 South.

 

Ramp from Route 28 South to I-66 East

Thursday night, January 14, and Friday night, January 15: midnight to 4 a.m.

The ramp will be closed. Traffic will be detoured further south on Route 28 to the exit for Route 29 (Lee Highway) North, stay to the right and exit to Route 28 North, to I-66 East.

 

Ramp from Braddock Road to Route 28 South

Thursday night, January 14, and Friday night, January 15: midnight to 4 a.m.

The ramp will be closed.  Drivers will be directed to access Route 28 South via the Westfields Boulevard/Route 28 Interchange.

 

Route 28 North at I-66

Ongoing

The right lane of Route 28 North at I-66 will remain closed to provide an extended merge lane for the ramp from I-66 East to Route 28 North.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES

Stringfellow Road North and South at I-66

Monday, January 11, through Friday, January 15: 9 a.m. to 5 p.m., and 9 p.m. to 5 a.m.

The right lane will be closed bridge work.

 

Route 286 (Fairfax County Parkway) North at I-66

Monday, January 11, through Friday, January 15: 9 a.m. to 3 p.m.

One lane will be closed for utility work.

 

Route 286 (Fairfax County Parkway) South at I-66

Monday, January 11, through Friday, January 15: 9 a.m. to 4 p.m.

One lane will be closed for utility work.

 

I-66 West from Route 50 to Route 286

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 (Fairfax County Parkway) to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

ROUTE 50 / FAIRFAX

I-66 West from Jermantown Road to Waples Mill Road

Tuesday, January 5, through Thursday, January 7: 9 p.m. to 5 a.m.

Friday, January 8: 9 p.m. to 9 a.m.

Three lanes closed for overhead bridge work.

 

I-66 West from Waples Mill Road to Route 50

Sunday, January 10, through Friday, January 15: 9 p.m. to 5 a.m.

I-66 West will be reduced to a single travel lane for bridge beam installation at Route 50.  Drivers should expect slowdowns and periodic short stoppages of up to 10 minutes between midnight at 4 a.m. to crews to set beams into place.

 

Route 50 East from West Ox Road to I-66

Sunday, January 10, through Friday, January 15: 9 p.m. to 5 a.m.

Route 50 East will be reduced to a single travel lane for bridge beam installation at Route 50. Drivers should expect slowdowns and at least two stoppages of up to 20 minutes between midnight at 4 a.m. for crews to set beams into place.

 

Ramp from Route 50 West to I-66 West

Sunday, January 10, through Friday, January 15: 10 p.m. to 4 a.m.

The ramp will be closed.  Traffic will be detour to the exit for West Ox Road North, stay to the right to take the exit for Route 50 East, and then follow signs to I-66 West. 

 

I-66 East from Route 50 to Waples Mill Road

Monday, January 11, through Friday, January 15: 9 p.m. to 5 a.m.

I-66 East will be reduced to one travel lane for overhead bridge work at Waples Mill Road.

 

I-66 West from Route 50 to Route 286 (Fairfax County Parkway) 

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

Route 50 East at I-66

Ramp from Route 50 East to I-66 East

Ongoing

The left lane will be closed for bridge construction.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 East and West between Jermantown Road and Blake Lane

Monday, January 11, through Thursday, January 14: 9 p.m. to 5 a.m.

Friday, January 15: 9 p.m. to 9 a.m.

Three lanes will be closed for overhead utility work on the new Route 123 Bridge over I-66 and for demolition of the old Route 123 Bridge over I-66.  Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m. nightly.

 

Ramp from I-66 East to Route 123 North and South

Thursday, January 14, and Friday, January 15: midnight to 4 a.m.

The ramp will be closed.  Traffic will be detoured to the exit for Nutley Street North, stay to the left and turn left at the traffic signal to Nutley Street North, then stay to the left to the intersection with Virginia Center Boulevard and make a U-turn at the traffic signal on to Nutley Street South, then stay to the right to exit to I-66 West back to Route 123.

 

Ramp from Route 123 North and South to I-66 East

Thursday, January 14, and Friday, January 15: midnight to 4 a.m.

The ramp will be closed.  Traffic on southbound Route 123 will be directed to take the exit for I-66 West, to Route 50 East, stay to the left to take the exit to I-66 East. 

 

Right-turn lane from Route 123 South to Rose Forest Drive

Ongoing

The right-turn lane will be closed for Verizon utility line relocation.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 East and West between Nutley Street and Blake Lane

Monday, January 11, through Friday, January 15: 9 p.m. to 5 a.m.

I-66 East and West will be reduced to a single travel lane for overhead bridge work at Vaden Drive.  Drivers should expect slowdowns and periodic stoppages between midnight and 4 a.m.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

I-495 (CAPITAL BELTWAY) / DUNN LORING

I-66 East from Cedar Lane to I-495
Tuesday, January 12, and Wednesday, January 13: 9 p.m. to 5 a.m.

Two lanes will be closed for overhead bridge work.

 

I-66 West from Virginia Lane to Gallows Road

Monday, January 11, through Thursday, January 14: 9:30 p.m. to 5 a.m.

One lane will be closed for overhead bridge work. Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m.

 

Gallows Road North between Bellforest Drive and Stenhouse Place

Monday, January 11, through Friday, January 15: 8:30 a.m. to 4 p.m.

One lane will be closed for utility work.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.