Week of February 16, 2020

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 ROUTE 29 / GAINESVILLE

No significant traffic impacts scheduled.

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

Ramp from I-66 West to Route 234 Business North

Tuesday, Feb. 18: midnight to 4 a.m.

The ramp will be closed for undergound drainage culvert work.  Traffic will be detoured to the exit for Route 234 Business South, exit to southbound Route 234 Business, then turn right on Covington Drive, turn right on Miramar Drive, turn right on Balls Ford Road, and then turn left at the traffic signal to northbound Route 234 Business.

I-66 East from Route 234 Business to Route 29 Centreville

Wednesday, Feb. 19: 9 p.m. to 5 a.m.

Three left lanes closed for overhead gantry removal.   Drivers should expect occasional 20-minute stoppages and slowdowns along westbound I-66 between midnight and 4 a.m.

ROUTE 28 (SULLY ROAD) / CENTREVILLE

Route 28 North and South between Route 29 and Braddock Road

Braddock Road at Route 28

Ramp from Route 28 North to I-66 East

Wednesday, Feb. 19, through Friday, Feb. 21: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on Route 28 North and South and on Braddock Road near Route 28 for blasting operations. Additionally, stoppages will occur on the ramp from Route 28 North to I-66 East and on the ramp from Route 28 North to I-66 West.

Compton Road at I-66

Tuesday, Feb. 18, through Friday, Feb. 21: 10 p.m. to 5 a.m.

Compton Road will be closed under I-66 while crews install bridge beams over Compton Road.   Thru-traffic will be detoured via Bull Run Post Office Road, Route 29 (Lee Highway), Old Centreville Road, and Mount Olive Road back to Compton Road.

I-66 East from Route 234 Business to Route 29 Centreville

Wednesday, Feb. 19: 9 p.m. to 5 a.m.

Three left lanes closed for overhead gantry removal.   Drivers should expect occasional 20-minute stoppages and slowdowns along westbound I-66 between midnight and 4 a.m.

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road between Fair Lakes Boulevard and Village Square Drive

Monday, Feb. 17, through Friday, Feb. 21: 9 p.m. to 3 p.m.

Friday, Feb. 21, from 9 p.m. until 3 p.m. Monday, Feb. 24

The right lane of southbound Stringfellow Road will be closed for underground utility relocation. The lane will be reopened weekdays between 3 p.m. and 9 p.m. to accommodate the evening rush. 

Route 286 North from Lee Highway (Route 29) to I-66

Monday, Feb. 17, through Thursday, Feb. 20: 9 p.m. to 5 a.m.

Two lanes closed for over head bridge demoltion of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

Route 286 South from Fair Lakes Parkway to I-66

Tuesday, Feb. 18, through Thursday, Feb. 20: 9 p.m. to 5 a.m.

Friday, Feb. 21: 10 p.m. to 8 a.m.

Two lanes closed for over head bridge demoltion of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

Ramp from I-66 West to Route 286 South

Thursday, Feb. 20, and Friday, Feb. 21: midnight to 4 a.m.

Temporary ramp closure for overhead bridge demolition.   Traffic will be directed to take the exit for Route 286 North, stay to the right and take the exit for Fair Lakes Parkway/Monument Drive,  then stay to the left and turn left at the traffic signal onto westbound Fair Lakes Parkway, and then stay to the left and follow signs to Route 286 South.

ROUTE 50 / FAIRFAX

I-66 East from West Ox Road to Route 123

Tuesday, Feb. 18: 9 p.m. to 5 a.m.

Three left lanes closed for overhead gantry removal.   Drivers should expect occasional 20-minute stoppages and slowdowns along westbound I-66 between midnight and 4 a.m.

Ramp from Route 50 West to I-66 West

Tuesday, Feb. 18: midnight to 4 a.m.

The ramp will be closed for utility work. Traffic will be detoured on Route 50 West to the West Ox Road (Route 608) interchange, take the exit for West Ox Road South, stay to the right to exit to Route 50 East back to I-66 West.

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 East from Waples Mill Road to Route 123

Tuesday, Feb. 18: 9 p.m. to 5 a.m.

Overhead bridge demolition at Route 123 will require lane closures along eastbound I-66. I-66 East will be reduced to one lane between 11 p.m. and 4 a.m.. All lanes will be reopened by 5 a.m.

I-66 East Collector-Distributor Lane at Route 123

Ramps from I-66 East to Route 123 North and South

Wednesday, Feb. 19, and Thursday, Feb. 20: midnight to 4 a.m.

Friday, Feb. 21, and Saturday, Feb. 22: midnight to 5 a.m.

The collector-distributor lane on eastbound I-66 to exit to northbound and southbound Route 123 will be closed for overhead bridge demolition at Route 123.   Traffic will be detoured farther east to Route 243 (Nutley Street) north, stay to the right for I-66 West, then follow signs for Route 123 North and South.  Addtionally, a single right lane on eastbound I-66 at Route 123 will be closed.

Route 123 North and South from I-66 to Eaton Place

Friday, Feb. 21: 10 p.m. to 8 a.m.

One lane closed on northbound and southbound Route 123 for crews to implement traffic pattern change at the ramp from I-66 East to Route 123 North.

ROUTE 243 (NUTLEY STREET) / VIENNA

No significant traffic impacts scheduled.

I-495 (CAPITAL BELTWAY)

Ramp from I-66 East to I-495 South Express Lanes

Tuesday, Feb. 18: 9 p.m. – 5 a.m.

The ramp from I-66 East to the I-495 South Express Lanes will be closed for utility work.  Drivers will be directed to take the exit for the I-495 South general-purpose lanes.