Week of February 14, 2021

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 (LEE HIGHWAY) / GAINESVILLE

I-66 West from Route 234 Business (Sudley Road) to University Boulevard

Monday, February 15, through Friday, February 19: 5 a.m. to 2 p.m.

Two lanes will be closed for road maintenance.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West from Route 234 Business (Sudley Road) to University Boulevard

Monday, February 15, through Friday, February 19: 5 a.m. to 2 p.m.

Two lanes will be closed for road maintenance.

 

ROUTE 29 (LEE HIGHWAY) / CENTREVILLE

I-66 West from Route 29 (Lee Highway) Centreville to Cub Run

Tuesday, February 16, through Friday, February 19: 9 p.m. to 5 a.m.

I-66 West will be reduced to one travel lane for crews to implement lane shifts.

 

Ramp from I-66 East to Route 29 Centreville

Tuesday, February 16, through Thursday, February 18: Midnight to 4 a.m.

The ramp will be closed. Traffic will be detoured farther east to Route 286 (Fairfax County Parkway) North, stay to the right and follow signs to I-66 West, then continue west to the exit for Route 29 in Centreville.

 

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Monday, February 15, through Friday, February 19: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

I-66 West from west of Route 29 Centreville to Cub Run

Ongoing

The HOV lane will be closed for retaining wall construction.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

Ramp from I-66 West to Route 28 North

Monday, February 15, through Friday, February 19: 11 p.m. to 5 a.m.

The ramp will be closed. Traffic will be detoured to Route 28 South, exit to Route 29 (Lee Highway) North, stay to the right and follow signs to Route 28 North.

Ramp from I-66 West to Braddock Road/Walney Road

Monday, February 15, through Friday, February 19: 11 p.m. to 5 a.m.

The ramp will be closed. Traffic will be detoured to Route 28 South, exit to Route 29 North, stay to the right and follow signs to Route 28 North, then follow signs to the Braddock Road/Walney Road left exit.

 

Route 28 North and South from Braddock Road/Walney Road to I-66

Monday, February 15, through Thursday, February 18: 9 p.m. to 5 a.m.

Friday, February 19: 10 p.m. to 6 a.m.

Two lanes will be closed for utility work.

 

I-66 West from Stringfellow Road to Route 28

Thursday, February 18: 9 p.m. to 5 am.

Three lanes will be closed for crews to remove an overhead gantry. Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m.

 

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Braddock Road between Newton Patent Drive and Route 28

Monday, February 15, through Friday, February 19: 11 a.m. to noon

Temporary 15-minute stoppages of traffic for blasting operations.

 

Route 28 North at I-66

Ongoing

The right lane of Route 28 North at I-66 will remain closed to provide an extended merge lane for the ramp from I-66 East to Route 28 North.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES

Stringfellow Road North and South at I-66

Monday, February 15, through Friday, February 19: 9 a.m. to 5 p.m., and 9 p.m. to 5 a.m.

The right lane will be closed for bridge work.

 

Stringfellow Road North and South between Fair Lakes Parkway and Westbrook Drive/Village Square Drive

Friday, February 19, and Saturday, February 20: 9 p.m. to 8 a.m.

Sunday, February 21: 9 p.m. to 5 a.m.

Stringfellow Road North and South approaching I-66 will be closed Friday and Saturday from 9 p.m. to 6 a.m., and Sunday 9 p.m. to 4 a.m. for overhead bridge beam installation. All lanes will open by 8 a.m. (5 a.m. Monday).  On the north side of I-66 thru-traffic will be directed to Fair Lakes Boulevard, turn right on to Fair Lakes Parkway, travel about one mile and turn right on to the ramp to Route 286 (Fairfax County Parkway) South, follow signs to Route 29 (Lee Highway) South, and travel about two miles on Route 29 South to reach the intersection with Stringfellow Road. Vehicles can then turn left for southbound Stringfellow Road or turn right to return toward I-66.

On the south side of I-66, thru-traffic will be directed to Route 29 North, travel north on Route 29 for two miles, then follow signs to Route 286 North. Drivers will then exit at Fair Lakes Parkway/Monument Drive and stay to the left to turn left at the traffic signal on to Fair Lakes Parkway, turn left on to Fair Lakes Boulevard, and then turn right on to Stringfellow Road to head north.

 

Ramp from Stringfellow Road to I-66 East/from I-66 West

Friday, February 19, and Saturday, February 20: 9 p.m. to 6 a.m.

Sunday, February 21: 9 p.m. to 4 a.m.

The ramp will be closed.

 

Route 286 (Fairfax County Parkway) North at I-66

Monday, February 15, through Friday, February 19: 9 a.m. to 3 p.m.

One lane will be closed for utility work.

 

Route 286 South at I-66

Monday, February 15, through Friday, February 19: 9 a.m. to 4 p.m.

One lane will be closed for utility work.

 

I-66 East and West at Route 50

Tuesday, February 16, through Thursday, February 18: 9:30 p.m. to 5:30 a.m.

I-66 East and West will be reduced to one travel lane at Route 50 for overhead bridge beam installation. Two-way traffic will run in the westbound travel lanes during these hours.

 

Ramp from Monument Drive to I-66 East and from I-66 West to Monument Drive

Tuesday, February 16, through Thursday, February 18: 10 p.m. to 5 a.m.

The ramp will be closed.

 

Ramp from I-66 East to Route 50 West

Tuesday, February 16, through Thursday, February 18: 10 p.m. to 5 a.m.

The ramp will be closed. Traffic will be detoured prior to the closure to Route 50 East, stay to the left and make a U-turn from the left-most turn lane at the Waples Mill Road traffic signal on to Route 50 West.

 

I-66 West from Route 50 to Route 286

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

ROUTE 50 / FAIRFAX

I-66 East from Monument Drive to Route 50

Friday, February 12: 9 p.m. to 5 a.m.

Sunday, February 14, and Monday, February 15: 9 p.m. to 5 a.m.

Friday, February 19: 9 p.m. to 5 a.m.

I-66 East will be reduced to a single travel lane for bridge beam installation at Route 50. Drivers should expect periodic stoppages of up to 20 minutes between 10:30 p.m. and 5 a.m. for crew to set beams.

 

I-66 East and West at Route 50

Tuesday, February 16, through Thursday, February 18: 9:30 p.m. to 5:30 a.m.

I-66 East and West will be reduced to one travel lane at Route 50 for overhead bridge beam installation. Two-way traffic will run in the westbound travel lanes during these hours.

 

Ramp from Monument Drive to I-66 East and from I-66 West to Monument Drive

Tuesday, February 16, through Thursday, February 18: 10 p.m. to 5 a.m.

The ramp will be closed.

 

Ramp from I-66 East to Route 50 West

Tuesday, February 16, through Thursday, February 18: 10 p.m. to 5 a.m.

The ramp will be closed. Traffic will be detoured prior to the closure to Route 50 East, stay to the left and make a U-turn from the left-most turn lane at the Waples Mill Road traffic signal on to Route 50 West.

 

Route 50 East from West Ox Road to I-66

Friday, February 12: 10 p.m. to 6 a.m.

Sunday, February 14: 9 p.m. to 5:30 a.m.

Monday, February 8, through Thursday, February 11: 10 p.m. to 5:30 a.m.

Friday, February 19: 10 p.m. to 6 a.m.

Route 50 East will be reduced to a single travel lane for bridge beam installation at I-66. Drivers should expect periodic stoppages of up to 20 minutes between 10:30 p.m. and 5 a.m. Sunday through Thursday, and between 11 p.m. and 5:30 a.m. Fridays for crews to set beams.

 

I-66 West from Waples Mill Road to Route 50

Friday, February 12: 9 p.m. to 5 a.m.

Two lanes will be closed for overhead bridge work at Route 50.

 

I-66 West from Route 50 to Route 286 (Fairfax County Parkway)

Ongoing

The HOV lane will be closed for roadway widening work.

 

I-66 East from Route 286 to Waples Mill Road

Ongoing

The HOV lane will be closed for pavement reconstruction.

 

Route 50 East at I-66

Ramp from Route 50 East to I-66 East

Ongoing

The left lane will be closed for bridge construction.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

Ramp from I-66 East to Route 123 (Chain Bridge Road)

Thursday night, February 18: midnight to 4 a.m.

The ramp will be closed. Traffic will be detoured to continue east on I-66 to the exit for Nutley Street North, stay to the left and turn left at the traffic signal on to Nutley Street North, stay to the left and turn left at the traffic signal to exit to I-66 West, then exit to Route 123.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 East and West between Nutley Street and Gallows Road

Tuesday, February 16, and Wednesday, February 17: 9 p.m. to 5 a.m.

Three lanes will be closed for overhead bridge work at Cedar Lane. Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m.

 

I-66 West from Nutley Street to Vaden Drive

Ongoing

The HOV lane will be closed for paving operations.

 

I-66 East from Blake Lane to Nutley Street

Ongoing

The HOV lane will be closed for paving operations.

 

I-495 (CAPITAL BELTWAY) / DUNN LORING

I-66 East and West between Nutley Street and Gallows Road

Tuesday, February 16, and Wednesday, February 17: 9 p.m. to 5 a.m.

Three lanes will be closed for overhead bridge work at Cedar Lane. Drivers should expect slowdowns and periodic 20 minute stoppages between midnight and 4 a.m.

 

I-495 North from Route 29 (Lee Highway) to I-66

Wednesday, February 17, and Thursday, February 18: 10 p.m. to 5 a.m.

Three lanes will be closed for overhead bridge work. Drivers should expect periodic stoppages of up to 20 minutes between midnight and 4 a.m.

 

I-495 South from Route 7 (Leesburg Pike) to I-66

Tuesday, February 16, through Thursday, February 18: 10 p.m. to 5 a.m.

Three lanes will be closed for overhead bridge work. Drivers should expect periodic stoppages of up to 20 minutes between midnight and 4 a.m.

 

495 Express Lanes South at I-66

Monday, February 15, through Friday, February 19: 10 p.m. to 5 a.m.

One lane will be closed for overhead bridge work. Drivers should expect periodic brief stoppages.

 

Ramp from 495 Express Lanes South to I-66 West

Tuesday, February 9, through Thursday, February 11: 10 p.m. to 5 a.m.

The ramp will be closed.

 

Ramp from I-495 South to I-66 West

Ongoing, through Monday, March 15

One lane will be closed for ramp construction.