The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 / GAINESVILLE

No significant traffic impacts scheduled.

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West near Bull Run

Monday, Apr. 6, through Friday, Apr. 10: 11 a.m. to 12 p.m.

Temporary 15-minute stoppages of traffic on I-66 West for blasting operations.

 

Ramp from Route 234 Business North and South to I-66 East

Monday, April 6, through Friday, April 10: 10 p.m. to 5 a.m.

The ramp from Route 234 Business North and South to eastbound I-66 will be temporarily closed for crews to set barrier and perform drainage work.  Traffic on northbound Route 234 will be directed to continue north to the intersection with Route 29, turn right on Route 29 and continue to the I-66/Route 29 Centreville interchange, stay to the left and continue to the intersection at Trinity Parkway/Machen Road. At the traffic signal, drivers will use the left-most turn lane only to make a U-turn onto Route 29 South, then stay to the right and follow signs to I-66 East.   Traffic on southbound Route 234 will be detoured to tun right on Balls Ford Road, turn left on Miramar Drive, turn left on Coverstone Drive, and then turn left onto northbound Route 234 to follow the detour.

 

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Monday, Apr. 6, through Friday, Apr. 10: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on I-66 East and West, Route 28 North and South for blasting operations.

 

Route 29 Centreville North and South at I-66

Turn lanes from Route 29 Centreville South to I-66 West

Monday, Apr. 6, through Friday, Apr. 10: 7 a.m. to 4 p.m.

Saturday, Apr. 11: 7 a.m. to 3 p.m.

Single lane closed on northbound and southbound Route 29 at I-66 for bridge pier construction.  The turn lanes from Route 29 South to I-66West will also be narrowed to a single lane.

 

Route 28 South from Westfields Boulevard to Braddock Road

Thursday, Apr. 9, and Friday, Apr. 10: 9 p.m. to 5 a.m.

Two lanes of southbound Route 28 closed for paving.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road North and South from Westbrook Drive to Fair Lakes Boulevard

Monday, Apr. 6, through Friday, Apr. 10: 3 a.m. to 6 p.m.

The right lane of northbound and southbound Stringfellow Road will be closed for utility relocation.

 

Route 286 North and South from Lee Highway (Route 29) to Fair Lakes Parkway

Monday, Apr. 6, through Thursday, Apr. 9: 9 p.m. to 5 a.m.

Friday, Apr. 10: 10 p.m. to 8 a.m.

Two lanes closed for over head bridge demoltion of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

 

Ramp from I-66 East and West to/from Monument Drive

Tuesday, April 7: 10 p.m. to 5 a.m.

Ramp temporarily closed for pavement works.

 

ROUTE 50 / FAIRFAX

Route 50 East at I-66

Monday, Apr. 6, through Friday, Apr. 10: 9 a.m. to 5:30 p.m.

Single lane closed for bridge abutment construction.

 

I-66 East from Monument Drive to Waples Mill Road

Wednesday, Apr. 8, and Thursday, Apr. 9: 9 p.m. to 5 a.m.

Three left lanes closed for overhead gantry removal.  Driver should expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.

 

I-66 East from Monutment Drive to Waples Mill Road

Monday, Apr. 6, and Tuesday, Apr. 7: 10 p.m. to 5 a.m.

Two left lanes closed for crew to mobilize a crane. 

 

I-66 West from Blake Lane to Jermantown Road

I-66 East from Waples Mill Road to Jermantown Road

Friday, Apr. 10: 9 p.m. to 5 a.m.

Three left lanes on westbound I-66 and two left lanes on eastbound I-66 will be closed for bridge work at Jermantown Road.  Drivers on westbound I-66 should also expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.

 

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Monday, Apr. 20

Single left HOV lane on westbound I-66 closed for center bridge pier work. 

 

I-66 East from Route 50 to Jermantown Road

Monday, Apr. 6, through Friday, Apr. 10: 8 a.m. to 6:30 p.m.

Single left HOV lane on eastbound I-66 closed for center bridge pier work.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 West from Blake Lane to Jermantown Road

I-66 East from Waples Mill Road to Jermantown Road

Friday, Apr. 10: 9 p.m. to 5 a.m.

Three left lanes on westbound I-66 and two left lanes on eastbound I-66 will be closed for bridge work at Jermantown Road.  Drivers on westbound I-66 should also expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.

 

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Monday, Apr. 20

Single left HOV lane on westbound I-66 closed for center bridge pier work. 

 

I-66 East from Route 50 to Jermantown Road

Monday, Apr. 6, through Friday, Apr. 10: 8 a.m. to 6:30 p.m.

Single left HOV lane on eastbound I-66 closed for center bridge pier work. 

 

                                                                                                     

ROUTE 243 (NUTLEY STREET) / VIENNA

Cedar Lane from Hilltop Drive to Cottage Street

Monday, Apr. 6, through Friday, Apr. 10: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for underground waterline relocation.

 

I-66 East and West between Cedar Lane and Blake Lane

Monday, Apr. 6, through Saturday, Apr. 11: 8 p.m. to 5 a.m.

Two right lanes closed for barrier wall demolition.   The eastound and westbound collector-distributor lanes at Nutley Street will also be narrowed. 

 

I-66 East and West between I-495 and Blake Lane

Wednesday, Apr. 8, and Thursday, Apr. 9: 9 p.m. to 5 a.m.

Three lanes closed on eastbound and westbound I-66 for overhead utlitlity reloation at Cedar Lane. Drivers should expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.

 

I-495 (CAPITAL BELTWAY)

I-495 North from Route 29 to I-66

Monday, Mar. 30, thorugh Friday, Aprl 3: 7 a.m. to 5 p.m., and 7 p.m to 5 a.m.

Single lane closed during daytime hours (7 a.m. to 5 p.m.) for bridge work.  During overnight hours (7 p.m. to 5 a.m.), two lanes will be closed.  

 

I-495 South from Route 7 to I-66

Monday, Apr. 6, through Friday, Apr. 10: 10 p.m. to 5 a.m.

Three left lanes will be closed for bridge work. Drivers should expect periodic 20-minute stoppages and slowdown on between midnight and 4 a.m.

 

Ramp from I-66 East to I-495 South Express Lanes

Tuesday, Apr. 7, through Thursday, Apr. 9: 8 p.m. to 5 a.m.

The ramp from eastbound I-66 to the southbound I-495 Express Lanes will be temporarily closed for utility work.  Traffic will be directed to use the I-495 South general purpose lanes.