Week of April 12, 2020

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

 

ROUTE 29 / GAINESVILLE

Route 29 North and South from Heathcote Boulevard to University Boulevard

Monday, Apr. 13, through Friday, Apr. 17: 9 p.m. to 5 a.m.

Two lanes on northbound Route 29 and one lane on southbound Route 29 closed for drainage installation.

 

I-66 West from Route 234 Business to Route 29 Gainesville

Monday, Apr. 13, through Friday, Apr. 16: 7 a.m. to 4 p.m., and  8 p.m. to 7 a.m.

Two lanes closed during daytime hours (7 a.m. to 4 p.m.) for paving.  During overnight hours (8 p.m. to 7 a.m.), three lanes will be closed.  

 

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 West from Route 234 Business to Route 29 Gainesville

Monday, Apr. 13, through Friday, Apr. 16: 7 a.m. to 4 p.m., and  8 p.m. to 7 a.m.

Two lanes closed during daytime hours (7 a.m. to 4 p.m.) for paving.  During overnight hours (8 p.m. to 7 a.m.), three lanes will be closed.  

 

I-66 West near Bull Run

Monday, Apr. 13, through Friday, Apr. 17: 11 a.m. to 12 p.m.

Temporary 15-minute stoppages of traffic on I-66 West for blasting operations.

 

I-66 West from Groveton Road to Prince William Parkway

Monday, Apr. 13, and Tuesday, Apr. 14: 9 p.m. to 5 a.m.

Three left lanes closed for survey work.

 

I-66 East from Groveton Road to Route 234 Business

Monday, Apr. 13, and Tuesday, Apr. 14: 8 p.m. to 5 a.m.

Three left lanes closed for overhead gantry removal.  Drivers should expect periodic 20-minute stoppages and slowdowns between midnight and 4 a.m.

 

Vandor Lane from Route 234 Business to Rest Area

Monday, Apr. 13, through Friday, Apr. 17: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for utility work.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

Route 29 Centreville North and South at I-66

Turn lanes from Route 29 Centreville South to I-66 West

Monday, Apr. 13, through Friday, Apr. 17: 7 a.m. to 4 p.m.

Saturday, Apr. 18: 7 a.m. to 3 p.m.

Single lane closed on northbound and southbound Route 29 at I-66 for bridge pier construction.  The turn lanes from Route 29 South to I-66West will also be narrowed to a single lane.

 

Compton Road at I-66

Monday, Apr. 13, through Friday, Apr. 17: 7 a.m. to 7 p.m.

Single lane, two-way traffic with flagging operation for bridge work.

 

Braddock Road between Route 28 South and Newton Patton Drive

Monday, Apr. 13 at 8 p.m., through Friday, Apr. 17 at 6 a.m.

Temporary closure of Braddock Road for paving operations.  Drivers on Route 28 South will not be permitted to turn right onto Braddock Road, and drivers on Braddock Road will not be permitted to turn right onto Route 28 South during this time.

 

Left-turn lanes from Route 28 North to Braddock Road

Ramp from I-66 West to Braddock Road

Monday, Apr. 13 at 8 p.m.

The two left-turn lanes on Route 28 North to Braddock Road and the spur ramp from I-66 West to Braddock Road will permanently close at 8 p.m.

 

I-66 East and West between Route 29 Centreville and Stringfellow Road

Route 28 North and South between Route 29 and Braddock Road

Monday, Apr. 13, through Friday, Apr. 17: 11 a.m. to noon

Temporary 15-minute stoppages of traffic on I-66 East and West, Route 28 North and South for blasting operations.

 

Route 28 South from E.C. Lawrence Park Athletic Fields to I-66

Monday, Apr. 13, through Thursday, Apr. 16: 8 p.m. to 6 a.m.

Two lanes of southbound Route 28 closed for paving.

 

Ramp from Route 28 South to I-66 West

Thursday, Apr. 16: 8 p.m. to 6 a.m.

Temporary closure of the ramp from southbound Route 28 to I-66 West.  Traffic will be directed to continue south on Route 28, take the exit for Route 29 South, stay to the left and turn left at the traffic signal to I-66 West.

 

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

Stringfellow Road North and South from Westbrook Drive to Fair Lakes Boulevard

Monday, Apr. 13, through Friday, Apr. 17: 3 a.m. to 6 p.m.

The right lane of northbound and southbound Stringfellow Road will be closed for utility relocation.

 

Route 286 North and South from Lee Highway (Route 29) to Fair Lakes Parkway

Monday, Apr. 13, through Thursday, Apr. 16: 9 p.m. to 5 a.m.

Friday, Apr. 17: 10 p.m. to 8 a.m.

Two lanes closed for overhead bridge demolition of I-66 bridges over Route 286.   Drivers should expect occasional 20-minute stoppages and slowdowns along northbound Route 286.

 

ROUTE 50 / FAIRFAX

I-66 East from Route 50 to Waples Mill Road

Monday, Apr. 13, through Thursday, Apr. 16: 9 p.m. to 5 a.m.

Two right lanes closed for geotechnical boring operations.

 

Route 50 East at I-66

Monday, Apr. 13, through Friday, Apr. 17: 9 a.m. to 5:30 p.m.

Single lane closed for bridge abutment construction.

 

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Monday, Apr. 20

Single left HOV lane on westbound I-66 closed for center bridge pier work. 

 

I-66 East from Waples Mill Road to Jermantown Road

Monday, Apr. 13, through Friday, Apr. 17: 8 a.m. to 6 p.m.

Single left HOV lane on eastbound I-66 closed for center bridge pier work.

 

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 West from Blake Lane to Jermantown Road

I-66 East from Waples Mill Road to Jermantown Road

Wednesday, Apr. 15, through Friday, Apr. 17: 9 p.m. to 5 a.m.

Three left lanes on westbound I-66 and two left lanes on eastbound I-66 will be closed for barrier and bridge work at Jermantown Road. 

 

I-66 West from Jermantown Road to Route 50

Beginning 8 p.m. Monday, Mar. 30, through Monday, Apr. 20

Single left HOV lane on westbound I-66 closed for center bridge pier work. 

 

I-66 East from Waples Mill Road to Jermantown Road

Monday, Apr. 13, through Friday, Apr. 17: 8 a.m. to 6 p.m.

Single left HOV lane on eastbound I-66 closed for center bridge pier work.

                                                                                                     

ROUTE 243 (NUTLEY STREET) / VIENNA

Cedar Lane from Hilltop Drive to Cottage Street

Monday, Apr. 13, through Friday, Apr. 17: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for underground waterline relocation.

 

I-66 East and West between Cedar Lane and Blake Lane

Monday, Apr. 13, through Saturday, Apr. 18: 8 p.m. to 5 a.m.

Two right lanes closed for barrier wall demolition.   The eastbound and westbound collector-distributor lanes at Nutley Street will also be narrowed. 

 

I-66 West from Cedar Lane to Vaden Drive

Friday, Apr. 17: 8 p.m. to 6 a.m.

Traffic on I-66 West will be diverted to the westbound collector-distributor lane for crews to implement lane shift on the westbound main lanes.

 

Saintsbury Drive from Vaden Drive to Blake Lane

Monday, Apr. 13, through Friday, Apr. 17: 7 a.m. to 5 p.m.

Single lane, two-way traffic with flagging operation for utility work.

 

I-495 (CAPITAL BELTWAY)

I-495 South from Route 7 to I-66

Monday, Apr. 13, through Wednesday, Apr. 16: 7 p.m. to 5 a.m.

Three left lanes will be closed for bridge work. Drivers should expect periodic 20-minute stoppages and slowdown on between midnight and 4 a.m.

 

I-495 North from Route 29 to I-66

Wednesday, Apr. 16, through Friday, Aprl 17: 7 a.m. to 5 p.m., and 7 p.m. to 5 a.m.

Single lane closed during daytime hours (7 a.m. to 5 p.m.) for bridge work.  During overnight hours (7 p.m. to 5 a.m.), two lanes will be closed.