September 9, 2018

Crews will continue shifting travel lanes and setting up concrete barriers to create safe work zones along Interstate 66. Upcoming planned construction activities include:

  • Setting up long-term lane shifts along I-66 between Sudley Road and Bull Run Drive, from Route 28 to West Ox Road, and between Cedar Lane and I-495
  • Clearing trees and brush inside the Route 28 and Route 123 interchanges and other areas where work zones are in place
  • Temporarily relocating underground utilities continues along I-66 near Jermantown Road
  • Continuing work to widen the median between Route 123 and Blake Lane to support upcoming traffic shifts

I-66 EAST BETWEEN ROUTE 243 AND GALLOWS ROAD
Thursday, September 13: 9 p.m. to 5 a.m.

Friday, September 14 – Saturday, September 15: 9 p.m. to 9 a.m

Three left lanes will be closed to implement long-term lane shifts for construction.

RAMP CLOSURE MONDAY EVENING SEPTEMBER 10 AT ROUTE 123 

The ramp from I-66 East to southbound Chain Bridge Road (Route 123) is scheduled to close Monday night, September 10 from midnight to 4 a.m. on Tuesday, September 11. Traffic will be detoured to Nutley Street (Exit 62) and directed to follow signs to I-66 West back to Route 123 South.

ROUTE 234 (SUDLEY ROAD) / MANASSAS

I-66 East from Groveton Road to Bull Run Drive
Thursday, September 13: 8 p.m. to 5 a.m.

Friday, September 14 and Saturday, September 15: 9 p.m. to 9 a.m.

Three left lanes will be closed to implement long-term lane shifts for construction.

 

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East from Route 28 to West Ox Road

Thursday, September 13: 8 p.m. to 5 a.m.

Friday, September 14 and Saturday, September 15: 9 p.m. to 9 a.m.

Three left lanes will be closed to implement long-term lane shifts for construction.

ROUTE 286 (FAIRFAX COUNTY PARKWAY)

I-66 East from Route 28 to West Ox Road

Thursday, September 13: 8 p.m. to 5 a.m.

Friday, September 14 and Saturday, September 15: 9 p.m. to 9 a.m.

Three left lanes will be closed to implement long-term lane shifts for construction

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

Ramp from I-66 East to Route 123 South
Tuesday, September 11: Midnight to 4 a.m.
Nighttime ramp closure to allow for setting of concrete barriers along previously shifted travel lanes. Traffic will be detoured to the Nutley Street Interchange and back.

 

Ramp from Route 123 South to I-66 West

Saturday, September 15: Midnight to 4 a.m.

Overnight closure of the ramp from Route 123 South to I-66 West. There will also be periodic stoppages of traffic on Route 123 South to remove an overhead gantry and set concrete barriers along previously shifted travel lanes. Traffic on Route 123 South heading to I-66 West will be directed to the I-66 East exit and will ride the ramps back to I-66 West.

 

Route 123 North at Ramp to I-66 East

Friday, September 14: 11 p.m. to 6 a.m.

Two left lanes will be closed and the ramp to I-66 East will be narrowed. There will also be periodic traffic stoppages of up to 15 minutes after midnight on Route 123 North and the I-66 East exit ramp to remove an overhead gantry.

 

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 East between Route 243 and Gallows Road

Sunday, September 9: 8 p.m. to 5 a.m.

Monday, September 10: 9 p.m. to 5 a.m.

Three left lanes will be closed to implement long-term lane shifts for construction.